5000m³/H Natural Gas Pretreatment Skid Installation System Skid-Mounted Equipment

Customization: Available
After-sales Service: Repairable Within The Warranty Period
Warranty: 2 Years

Product Description

Technical Specifications
Function
Storage Pressure Vessel
Application
Mixture
Material
Stainless Steel
Pressure
0.1MPa≤p<1.6MPa
Storage Medium
Moncombustible/Nontoxic
Pressure Level
Low Pressure
Condition
New
Certificate
GB150 ISO ASME GOST
Capacity
500sets/Year
Specification
0.28-100m³
Product Overview
Our high-performance Tubular Heat Exchanger represents the pinnacle of thermal transfer technology, engineered for reliability, efficiency, and longevity in the most demanding industrial environments. Features a robust construction that excels in handling high pressures, high temperatures, viscous fluids, and fluids with suspended particulates.
This project provides pre-treated gas for a 2 MW gas-fired generator unit with a processing capacity of 5000 m³/h. The system processes natural gas from the wellhead (80% CH4 and 20% C2+) to meet strict generator inlet requirements.
Technical Solution & Advantages
⚙️
Core Design
Advanced adsorption and separation processes to remove impurities, moisture, and H2S.
💧
Dehydration
Molecular sieve scheme with dual tower regeneration logic for continuous operation.
🏗️
Modular Integration
"Factory prefabrication - overall transportation - rapid installation" optimization.
Main Process Equipment
  • Gas-liquid separation pry: Three-stage separation with 99.9% efficiency for particles ≥ 5 μm.
  • Dehydration pry: 13X molecular sieve, 6.3 MPa design pressure, dew point ≤ -40 ºC.
  • Desulfurization filtration: ZnO desulfurizer achieving H2S < 5 ppm.
  • Control System: PLC+SCADA for full process automation and remote monitoring.
Natural Gas Pretreatment Skid 1
Natural Gas Pretreatment Skid 2
Technical Advantage Demonstration
The system design strictly benchmarks customer requirements. The desulfurization unit has passed 1000 hours of continuous operation testing, with export H2S concentration stably controlled at 2-3 ppm. The factory integration test has a pass rate of 100%, ensuring immediate compliance upon delivery.
Equipment View 1
Equipment View 2
Equipment View 3
Equipment View 4
Equipment View 5
Equipment View 6
Certificates
Certification
Frequently Asked Questions
What is the processing capacity of this pretreatment system?
The system is designed with a processing capacity of 5000 m³/h, specifically optimized for 2 MW gas-fired generator units.
What purification standards does the gas reach after treatment?
The system achieves deep purification with H2S < 5 ppm, water dew point ≤ -40 ºC, and solid impurity removal down to 1 μm.
How does the modular design benefit the installation process?
The modular "pry" design allows for 100% factory prefabrication. On-site installation is reduced to simple pipeline and electrical connections, typically completed in less than 3 days.
What safety certifications does the equipment hold?
The entire system has passed SIL 2 safety certification. It includes gas leak detection with a response time of less than 1 second and emergency shutdown functions.
Is remote operation supported?
Yes, the system utilizes a PLC+SCADA control system that supports remote data transmission and remote control, enabling unmanned operation modes.
What information is required for a technical inquiry?
Please provide working conditions, medium composition, operating temperature, pressure requirements, and any specific material or sizing requests.

Related Products